Cadastral-grade mapping of a 14.2 km ring-road corridor, delivered without a single lane closure.
Municipality / road design institute
≤ 4.0 cm → 2.8 cm (RTK FIX)
≤ 6.0 cm → 3.7 cm
≤ 8.0 cm → 5.1 cm
Contours, breaklines and the as-built drawing.
Attributed layers for GIS systems.
High-resolution GeoTIFF orthophoto and terrain model.
Earthwork or area calculations, ready for stakeholders.
The full 14.2 km corridor was mapped in two flight days instead of an estimated three weeks of ground traverse.
No lane closures were needed, and no crew had to work roadside in live traffic.
GIS-ready parcel boundary layers resolved the encroachment dispute ahead of the permitting hearing, keeping the project on schedule.
We will survey a test area (up to 0.5 ha) of your current project free of charge. You will receive a point cloud or an orthomosaic to verify the data quality in your own CAD software before the project starts.